|
190
|
ARLINGTON ST
|
Interior Fit-out for
2-family; including all new Elec/Plumb/insul; 1st/2nd Fl: Gut kitchen/bath 3rd Fl: gut bath & replace
|
|
76
|
ARSENAL ST
|
Reroof 15% of total roof
area, 7.65 sf over existing install rigid
insulation and rubber membrane roof system & flashings
|
|
485
|
ARSENAL ST
|
Interior remodel of exist. Space C0 - 6 for new tenant 'SPRING
Shoe"
|
|
19
|
BANCROFT ST
|
1st Floor Kitchen remodel
|
|
40
|
BEACON PK
|
Strip & reside;
soffits, gutters, cover window trim w/alum coil; replacement windows front
porch
|
|
106
|
FRANKLIN ST
|
Replace 4 Windows
|
|
84
|
GARFIELD ST
|
Remove portion of existing
roof and build new 2nd fl 29?-3"x51?-6" with rear balcony 5 1/2'x
10 1/2'
|
|
601-613
|
MT AUBURN ST
|
Interior renovations for
new nail salon (as shown on plan) Work Location #609 Mt Auburn
|
|
175
|
NO BEACON ST
|
Demo & replace men's
bathroom at Howe Press 1st floor Mfg. area
|
|
204-206
|
NO BEACON ST
|
3rd Floor bathroom remodel
|
|
29
|
NYACK ST
|
Trench - for water ser vice
|
|
270
|
PLEASANT ST
|
Trench
|